Cogeneration Systems



GTG: Gas turbine generator
HRSG: Heat Recovery Steam Generator
STG: Steam turbine generator
SAC: Steam Absorption chiller

Cogeneration system is one of solution to save a energy for supplying and distributing electricity and heat energy.

Heat energy are produced by exhaust gas and/or jacket cooling water.

Power generation
Gas turbine generator
Steam turbine generator
Reciprocating generator
Fuel cell
etc.

Steam generation
Water tube type heat recovery
Steam generator
Smoke tube type heat recovery
Steam generator

Heat energy usage
Process steam supply
Hot water supply
Chilled water supply
-Steam driven centrifugal chiller
-Steam absorption chiller



GTG: Gas turbine generator
HRSG: Heat Recovery Steam Generator
AGB: Auxiliary boiler
SAC: Steam Absorption chiller
ACC: Air cooled chiller
TES: Chilled Water Storage Tank

Project Description
Power and chilled water are supplied to renovated and existing facilities of University Technologies of Petronas. Its unique configuration is available to achieve the high effective operation due to peak cut of both daily peak demand of power and chilled water. The chilled water thermal storage tank is effective for leveling of power generation too.

Date of completion: Oct 2001


Major Equipment are as follows
GTG: 4.2 MW x 2 units (future add 2 more units)
HRSG: 10 ton/h x 2 units (future add 2 more units)
AGB: 15 ton/h
SAC: 1250 RT x 2 units (future add 2 more units)
ACC: 325 RT x 2 units (future add 2 more units)
TES: 10,000 RTH



GTG: Gas turbine generator
HRSG: Heat Recovery Steam Generator
STG: Steam turbine generator
AGB: Auxiliary boiler
SAC: Steam Absorption chiller
SWG: Switchgear

Project Description
Power, process steam and chilled water are supplied to New Airport Facilities included air-conditioning system for Main Terminal Buildings@and Thai Air Catering Center

Date of completion: Feb 2006





Major Equipment are as follows
GTG: 20 MW x 2 units (GE Frame 5) Supplied by EGAT
HRSG: 42.5 ton/h x 2 units
STG: 13.5 MW x 1 unit
AGB: 18 ton/h x 2 units, 20 ton/h x 2 units
SAC: 1500 RT x 3 units, 1970RT x 2 units
SWG: 115kv 7 bays