Cogeneration system is one of solution to save a energy for supplying and distributing electricity and heat energy.
Heat energy are produced by exhaust gas and/or jacket cooling water.
Power generation Gas turbine generator Steam turbine generator Reciprocating generator Fuel cell etc.
Steam generation Water tube type heat recovery Steam generator Smoke tube type heat recovery Steam generator
Heat energy usage Process steam supply Hot water supply Chilled water supply -Steam driven centrifugal chiller -Steam absorption chiller
GTG:
Gas turbine generator
HRSG:
Heat Recovery Steam Generator
AGB:
Auxiliary boiler
SAC:
Steam Absorption chiller
ACC:
Air cooled chiller
TES:
Chilled Water Storage Tank
Project Description Power and chilled water are supplied to renovated and existing facilities of University Technologies of Petronas. Its unique configuration is available to achieve the high effective operation due to peak cut of both daily peak demand of power and chilled water. The chilled water thermal storage tank is effective for leveling of power generation too.
Date of completion: Oct 2001
Major Equipment are as follows
GTG:
4.2 MW x 2 units (future add 2 more units)
HRSG:
10 ton/h x 2 units (future add 2 more units)
AGB:
15 ton/h
SAC:
1250 RT x 2 units (future add 2 more units)
ACC:
325 RT x 2 units (future add 2 more units)
TES:
10,000 RTH
GTG:
Gas turbine generator
HRSG:
Heat Recovery Steam Generator
STG:
Steam turbine generator
AGB:
Auxiliary boiler
SAC:
Steam Absorption chiller
SWG:
Switchgear
Project Description Power, process steam and chilled water are supplied to New Airport Facilities included air-conditioning system for Main Terminal Buildings@and Thai Air Catering Center
Date of completion: Feb 2006
Major Equipment are as follows
GTG:
20 MW x 2 units (GE Frame 5) Supplied by EGAT
HRSG:
42.5 ton/h x 2 units
STG:
13.5 MW x 1 unit
AGB:
18 ton/h x 2 units, 20 ton/h x 2 units
SAC:
1500 RT x 3 units, 1970RT x 2 units
SWG:
115kv 7 bays
Copyright (C) 2006 Shinryo Corporation. All Rights Reserved.