Since 1970, Shinryo has been advancing its district heating and cooling (DHC) technologies to become the leading DHC Contractor in Japan. These efforts reflect our environmentally friendly corporate policy and contribute to society, urban life and all mankind.

Our DHC plants are designed with the following objectives;
Energy efficient
Environmentally friendly
Stable and reliable energy supply

Our projects are operational at over 80 sites in Japan, and since 1996, our first Asian DHC project" the KLIA CGS/DCS plant" has been supplying chilled water to various Kuala Lumpur International Airport facilities. Today, our DHC operations extend to plants in Singapore, Thailand and the United Arab Emirates.

 




Asia is increasingly turning to large scale heating and cooling systems for multiple buildings in order to achieve such objectives as reducing air pollution, saving energy, countering global warming, as well as making efficient use of new energy resources. Drawing upon the experience and original technologies developed over the years, Shinryo has been involved in a number of district heating and cooling projects. All of these projects have been designed to provide a stable and cost-effective energy supply whilst respecting the environment in the process.


Aomi South DHC Area
in Tokyo


Nagoya DHC Area
in Aichi


Thermal Storage at Minatomirai 21 DHC Plant
In Yokohama


Minatomirai 21 DHC Plant
in Yokohama

Ebisu DHC Area
in Tokyo

Shinjuku DHC Area
in Tokyo

Tachikawa DHC Area
in Tokyo

Shinagawa DHC Area
in Tokyo






Shinjuku DHC Plant (Japan)

Since 1971, chilled water and steam were supplied to Shinjuku West New Town area, at 1991 DHC Plant was fully shifted at present location.
Total chilled water capacity is 59,000 RT, steam production is 248 ton/h and power generation is 8500 KW

Owner: Energy Advance Co., Ltd
Date of Completion: Jul 1995



 

Minato Mirai 21 DHC Plant (Japan)

Plant was designed for new development of Yokohama Port Side Town development to be named MM21.Plant was designed to link to other 3 nos. Plant, 2nd Plant was started to operate since 1997.1st Plant was applied the 30,000 RTH ice storage system (PCM : ice ball)

Owner: Minato Mirai 21 DHC Co., Ltd
Date of Completion: Apr 1989



  Kuala Lumpur International Airport CGS/DCS Plant (Malaysia)

Since 1997, chilled water and electricity were supplied to airport facilities, We Shinryo contract Chiller Plant Package which designed 35,000 RT chilled water capacity. Chillers are each 2500 RT double effect steam absorption type, and present installation quantity was 12 nos.

Owner: Gas District Cooling (M) Sdn Bhd
Date of Completion: Mar 1997



  Putrajaya Precinct 1 DCS Plant (Malaysia)

Putrajaya area was developed to transfer the capital city Kuala Lumpur in Malaysia. Plant started to supply chilled water to the government office complex in 1999. Plant capacity was 27,500 RT which included ECC 1250 RT 2 nos. integrated chilled water storage system, SAC 2500 RT 5 nos and DFC 1500 RT 5 nos.

Owner: Gas District Cooling (M) Sdn Bhd
Date of Completion: Dec 2000



  Biopolis DCS Plant (Singapore)

Biopolis is envisioned to be a world-class biomedical sciences research and development (R&D) hub in Asia. Biopolis DCS plant has been in commercial operation since July 2003. We Shinryo contract Chiller Plant Package which designed 10,000 RT chilled water capacity. ECC are each 2000 RT integrated chilled water storage system.

Owner: First DCS Pte Ltd
Date of Completion: Jul 2003

  Woodlands DCS Plant (Singapore)

Woodlands Wafer Fab Park located in the northern region of Singapore, the park is in the vicinity of the Woodlands Regional Centre and well-linked to the city and airport. Plant will be started to supply chilled water to Wafer Fab Plant in 2006.Plant capacity is 4,000 RT which included ECC 2000 RT 2 nos. integrated chilled water storage system.

Owner: First DCS Pte Ltd
Date of Completion: Oct 2006