The equipment and pipings of the plant room are divided into several modules, each of which is manufactured and assembled at a factory, then brought to the construction site and installed in connection with each other. The development of an Electro hydranlic-powered transporter anables the accurate installation at the site
1. Factory manufacturing
2. Carrying into site
3. Installation of modules with electro hydranlic powered transporter
4. Connection between Modules
5. Completed Installation
1
Patent No.2879325
Piping Assembly Jig using Laser
2
Patent No.2920830
Three Dimension Piping Assembly using Laser
3
Patent No.3537397
Transportation Machine for Large Scale Equipment and method of Statement for this machine